Site logo

How Long Does Tailoring Take in the UAE 2026 ?

Ask “when will this be ready?” at any UAE tailor and you’ll get vague answers like “come back in a few days” but that could mean three days during normal times or two weeks before Eid. This guide gives you the specific timelines for different tailoring services in the UAE, what pushes those dates longer, and how to avoid delays, all based on how tailoring actually works across Dubai, Abu Dhabi, and Sharjah from neighborhood shops to premium tailoring houses.

Key Insights

  • Peak seasons double or triple normal timelines — Late Ramadan, pre-Eid weeks, August (school uniforms), and October-March (weddings) turn a 3-day hem into 10-14 days.
  • Submit Eid outfits 3-4 weeks early, not 1 week — Simple alterations need 3 weeks minimum, custom pieces need 4 weeks. One week before Eid is too late.
  • Wedding attire needs 4-6 weeks, not 4 days — Alterations: 3-4 weeks. Made-to-measure: 4-6 weeks. Bespoke: 6-8 weeks.

Average Tailoring Timelines in the UAE

Tailoring timelines in the UAE vary significantly based on the complexity of work. Here’s what to expect during normal periods expect that Ramadan, Eid, school uniform season, and wedding season can double or triple these timelines:

Service TypeTimelineWhat’s IncludedTypical Cost
Simple Alterations2-5 daysHemming, sleeve shortening, waist adjustments, kandura length changes. Neighborhood tailors: 2-3 days.
Mall locations: 4-5 days.
AED 15-40
Moderate Alterations5-10 daysTaking in jackets, restructuring shoulders, replacing zippers, significant resizing. Involves partial deconstruction and rebuilding.AED 50-150
Custom Made-to-Measure7-14 daysCustom kanduras, basic abayas, made-to-measure suits. Includes measurements, cutting, construction, one fitting, and final adjustments.AED 150-800+
Full Bespoke14-28 daysTrue bespoke suits, heavily embellished abayas, hand-stitched traditional wear. Unique pattern creation, 2-3 fittings, hand-finished details.AED 1,500-8,000+
Express Service24 hours-3 daysCuts standard timelines in half for simple work only. Limited availability during peak seasons. Not recommended for complex alterations.+50-100% of standard cost

What Affects Tailoring Time in the UAE?

  • Peak Seasons: Late Ramadan stretches 3-day alterations to 10-14 days. Custom kanduras needing 7-10 days normally take 3-4 weeks. School uniform season in August creates identical backlogs early August submissions take 3-5 days, late August takes 7-10 days minimum. Wedding season (October-March) adds 3-5 days to all formal wear timelines.
  • Fabric Type: Silk, chiffon, and heavily embellished materials take twice as long as cotton delicate handling and slower stitching speeds are non-negotiable. Heavy fabrics (thick denim, wool) also slow down work. Patterned fabrics (stripes, plaids) need careful alignment, adding time but ensuring quality results.
  • Work Complexity: One alteration is faster than three on the same garment. Surface changes (moving buttons) take hours. Structural changes (reshaping shoulders) take days. Custom pieces start from raw fabric instead of completed garments always longer than alterations.
  • Location and Shop Type: Small neighborhood tailors finish simple work in 2-3 days due to lower customer queues. Busy mall locations need 4-5 days for identical work despite more staff. Specialty shops (kandura-only tailors in Bur Dubai) complete custom kanduras in 5-7 days versus 10-14 days at general tailors because it’s their primary expertise.

How to Get Your Clothes Faster

Build a relationship with one reliable tailor regular customers get priority and faster service without express fees. Submit work Sunday through Tuesday; Thursday/Friday drop-offs sit idle through the weekend, adding 2-3 days. State specific deadlines clearly: “I need this by Wednesday” forces commitment better than “when will this be ready?”

Bring clean garments with intact buttons and zippers. Consolidate all alteration requests at drop-off adding changes mid-process restarts your timeline. During Ramadan, Eid, August, or wedding season, submit early or pay premium express rates. Peak season timelines are non-negotiable.

Red Flags That Signal Delays

  • Vague or Absent Pickup Dates: Professional tailors give specific dates: “ready by Wednesday” or “pick up next Thursday.” Responses like “maybe few days” or “call me first” signal disorganization or overbooking.
  • No Receipt, Tag, or Tracking System: Minimum acceptable practice includes a numbered tag with your details, garment description, requested work, and promised date. No documentation means higher chances of mix-ups or lost items.
  • Unrealistic Promises for Complex Work: A tailor promising major suit restructuring tomorrow or a custom embellished abaya in three days is either lying or planning rushed, low-quality work. Honest tailors explain what work requires and quote realistic timelines.
  • Chaotic Shop Environment: Disorganized piles of unlabeled clothes, no clear workflow, and confused staff signal problems. A clean, organized shop even when busy demonstrates reliable systems.
  • Constant Need to Follow Up: One call the day before pickup is reasonable. Needing three or four calls over a week means the tailor is overcommitted or disorganized both lead to unreliable timelines.

Express vs. Standard Tailoring Services

Express typically costs 50-100% more a AED 25 hem becomes AED 40-50 for same-day delivery. This premium is worth it for genuine urgency (meeting tomorrow), but wasteful for routine planning (event in three weeks).

Express works best for simple alterations during normal periods. Hemming trousers overnight or shortening a dress by tomorrow are reasonable requests. Express becomes problematic for complex alterations or during peak seasons jacket restructuring in 24 hours forces corner-cutting, while requesting express two days before Eid often means paying extra with no actual speed benefit.

Many tailors stop offering express during Ramadan, pre-Eid weeks, and August. Some high-end shops maintain separate express capacity year-round but charge 150-200% premiums during peak seasons.

Real-Life Scenarios & Expected Timelines

School Uniforms: Early August Submission

Submit uniform alterations in early August (3-5 days turnaround), not late August (7-10 days minimum). If school starts August 28, have uniforms ready by August 25. That means submitting by August 18-20, or August 11-13 for multiple children with several pieces each. Cost: AED 10-15 per piece at neighborhood tailors, AED 15-25 at malls.

Eid Outfit Preparation: Minimum Three Weeks

Submit simple alterations three weeks before Eid, custom orders four weeks before, and embellished/bespoke pieces five to six weeks before. Standard alterations that take 3-4 days normally stretch to 10-14 days during late Ramadan. Custom kanduras or abayas requiring 7-10 days can take 3-4 weeks. Express service premiums reach 200% during the final two weeks before Eid.

Wedding Attire: Four to Six Weeks

Wedding guest outfits need 3-4 weeks for alterations to existing garments, 4-6 weeks for made-to-measure, and 6-8 weeks for full bespoke. Wedding party members should add an extra week. During wedding season (October-March), a suit alteration might take 10-12 days versus 6-8 days in May. Simple alterations cost AED 80-200, made-to-measure suits start around AED 1,200-1,500, and full bespoke runs AED 3,000-8,000+.

Business Wear: Two Weeks Standard

Business suit alterations need two weeks during normal periods. If relocating to the UAE with multiple suits, plan for 2-3 weeks total. Custom made-to-measure shirts take 7-10 days, custom suits need 10-14 days. Alterations cost AED 100-250 per suit, while made-to-measure business suits start around AED 800-1,200 for acceptable quality.

Everyday Clothing: 3-5 Days

Casual alterations to jeans, dresses, or shirts offer the most flexibility with standard 3-5 day turnarounds. Costs: AED 15-25 for jeans hemming, AED 20-40 for dress alterations, AED 15-30 for shirt repairs. Neighborhood tailors usually price lower than mall locations.

How long do most tailors take?

Simple alterations take 2-5 days, moderate work needs 5-10 days, custom pieces require 7-14 days, and bespoke takes 14-28 days. Peak seasons (Ramadan, Eid, August, October-March) double or triple these timelines.

How fast can tailoring be done?

Express service delivers in 24 hours to 3 days for simple alterations, costing 50-100% more. Complex work shouldn’t be rushed. Express availability drops during Ramadan, Eid, and August when demand peaks.

Can a suit be tailored in 2 days?

Simple alterations (hemming, minor adjustments) yes with express service during normal periods. Complex restructuring (shoulders, chest) no rushing produces poor quality. Made-to-measure or bespoke needs 7-28 days minimum.

Can pants be tailored in one day?

Basic hemming can be done same-day or next-day with express service during normal periods for an extra AED 20-30. Not available during peak seasons. Multiple alterations need standard 2-5 day timelines.

Comments

  • No comments yet.
  • Add a comment